Turnkey Work Specification

MATERIALS USED IN CIVIL WORK AS BELOW MENTION:

  1. CEMENT: UltraTech
    2. STEEL: Kamdhenu
    3.  AGREGATE :  5-20MM (20-30% mixed) or as required
    4. SAND: Red sand small/medium
    5. Brick: No 1 for all walls

FOOTING & PLINTH (ground only)

1. Excavation for all new foundation footing from NGL level.
2. Primary Plinth beam at NGL 
3. 9” Brick wall on above primary outer beam, 
8. Main Plinth Beam at KURSHI Level

COLUMN, SLAB

1. Slab to slab Height 11 foot.
2. Slab casting with conduit electric work. 

BRICK & PLASTER

1. DPC – ZIRA GITTI concrete on plinth.
2. Bitumen Paint on DPC.
3. Brick wall outer 9” internal 5”.
4. Lintel at door window top level 
5. Internal Plaster of all wall.
6. DOCHATTI Bathroom.

WATER-PROOFING

  1. Dr. Fixit URP or Equivalent water-proofing of bathrooms, kitchen wall. (Ground), wall
    and floor area (2nd & above floor)

    ANTI TERMITE

    1. Anti-termite in footing, 

PLUMBERING WORK: 
1. CPVC Pipes.

2. Master Control at terrace / near overhead water tank to shut the water-supply.
3. Water tank of 1000 liter capacity.
4. Down from terrace for rain water
5. Fresh water in Kitchen & Toilet.
6. Sanitary Fittings like WC, Basin, shower, mixer Etc.

  1.  

WIRING / ELECTRIC WORK 

1. FR, ISI, 1100V grade Fire-resistant electrical wire.
2. Light circuit: 1.5 sq. mm wires.
3. Medium circuits: 2.5 sq. mm wires.
4. Power circuit AC/ Geyser: 4 sq. mm wires.
5. MCBs, ELCBs, Distribution Boards. 
6. Separate Earthing.

  1.  

INTERNAL FLOORINGS

Vitrified flooring tiles on PCC 

  1.  

TOILET

1. Wall up to 7’ & flooring tiles 
2. Universal white W.C. Indian style/ Western style
3. Sanitary/CP fitting, WC, wash basin, wall mixture, shower, towel rail, soap dish
4. Mirror at basin.
5. Geyser provision

  1.  

KITCHEN

1. Kitchen counters tops
2. Wall tiles 
3. Sink with Tap.
4. WASH BASIN IN Dining area.
5. Geyser provision

  1.  

DOORS

1. All doors frame Steel pipe/Wood. 
2. Main Door of wood with wooden Mosquito Mess
3. Internal with Laminate & other with all MS fitting and fixtures.
4. Bathroom doors of UPVC, ready to install

WINDOWS

1. UPVC 3track sliding windows, or  Traditionally Wood Windows with mesh.
2. Steel grill on windows.
3.ventilation with exhaust provision in bathroom.

PAINT

1. Putty + Primer + Paint on all surface.
2. For Iron enamel paint.

TERRACE / BALCONY

1. Parapet
2. Iron Grill to cover OTS open with canopy 
3. Railings or brick design as per architecture view

OPEN AREA-BOUNDRY

1. Parking / exterior Tile on open area.
2. Main steel Gate.

Requests:

Schedule a Meeting with Us

Ready to bring your vision to life? Schedule a meeting with us today! Our team at Buildway Infra is eager to discuss your project, understand your needs, and explore how we can transform your space into something truly special. Contact us to set up a consultation at your convenience, and let’s start creating the perfect environment for you.